![]() “I saw a flame and then I knew something was up.It engulfed very, very quickly. ![]() “The train stopped and sparks starting coming out of the front, probably about three feet behind the driver,” Gosselin explained. John Gosselin, who is staying at the nearby Encore Boston Harbor, happened to be looking out of his hotel window as the chaotic scene unfolded. Poftak noted that the train in question was last inspected on June 23, 2022, and first put into service in 1980. We remain committed to prioritizing safety and reliability to deliver the service our riders deserve.ĭuring an afternoon news conference, MBTA General Manager Steve Poftak announced that a metal sill broke off the lower section of the train and it made contact with the third rail, “causing an ignition.” He called this latest incident “incredibly frustrating.” We understand that this and other recent incidents have tested our riders’ and the public’s trust. With a more extensive inspection already underway, we will take every necessary step to prevent this from happening again. We are deeply disappointed that this incident occurred and sincerely apologize to our riders who were on the train, as well as to our ridership as a whole. We will be transparent with our findings and will provide updates as they become available. A preliminary inspection indicates a section of the sheet metal, or side panel, on the vehicle, appears to have come in contact with the third rail, igniting material below the car. MBTA & emergency personnel quickly responded, shutting down power, and safely assisting ~200 passengers from the train. This morning, an Orange Line train reported flames & smoke coming from its head car as it traveled across the bridge between Wellington & Assembly stations.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |